Tubing Tally

Tubing Tally

Tubing Tally, is not just another simple Tbg Tally spreadsheet this Tubing Tally is complete with BHA add in, KB Correction, the program will allow you to not only produce the standard type of oil field tally sheets which are automatically completed for you as you enter your pipe tally. But also includes a well bore completion schematic to produce professional well completion sketches, The library of completion tools consists of down hole tool icons for vertical wells and horizontal wells.

Tubing Tally also includes a Hi-Resolution final well report for both vertical and horizontal completions with a vertical and horizontal tool library. The program comes complete with a well bore diagram template for both vertical wells and horizontal wells. the library of hi-resolution graphics which will allow you to produce professional hi impact well bore schematics

Tubing Tally 32 Bit. Optional selection

  • Tbg Size, ID, ppf,
  • Drift sizes are auto updated
  •  Connection type,
  • Grade,
  • Mud Weight
  • Weight in Air
  • Buoyed Weight
  • Drift size is auto filled in for you from the database.
  • Displacement
  • Volume
  • Depth plus BHA
  • Reverse Tally
  • Vertical Well Bore Graphic and Components
  • Horizontal Well Bore Graphic and Components
  • You can build a professional Well Bore Schematic with the available tools

You have the option of including the KB correction for accurate packer placement and leak isolation. As you enter the tubing lengths the capacities weight in air, buoyed weight plus corrected depths if a BHA is included are all automatically updated for you.

All the data you enter is linked to standard oil field tally sheets which can be printed or emailed

If you have laid down the tubing string the program includes a reverse tally section as there can be a considerable difference between picking up or running in and out of the derrick

The program includes a reverse tally if you laid down tubing there is a considerable difference in running tubing from the derrick or picking up tubing from the ppe racks

Pipe tally includes both casing tally and tubing tally, but separate versions are available

daily drilling report
  •  x 

Daily Drilling Report

Daily Drilling Report. Fast and  efficient

  • Reporting system
  • Hydraulics
  • Bit record
  • Mud data
  • Formation data
  • Directional Survey
  • Mud parameters
  • Onshore Offshore Application
  • Full API style Daily Drilling Report Email directly to the Office
  • BOP Drills
  • People on Board

Daily Drilling Report, is very simple to use but very comprehensive, the Daily Drilling Report covers all daily drilling hydraulics and full reporting for mud data, formation data, bit record, supervision, for Onshore, Shallow Water Offshore and Deep Water reporting, for offshore rigs the report includes anchor tensions, weather report, people on board. Once the report is completed it can be emailed from within the program and also exported and saved to a local rig file.

Rod Pump Completions

Rod Pump Completions graphic

Rod Pump Completions graphic
This is the separate Rod Pump Completion program for rig supervisors that don’t need the full features in the Workover Office Professional version
You still have all the volumetric well bore calculations for isolating casing leaks along with cement plug, pipe in pipe out, calculations for plug backs and squeezes

Workover Office includes 1000 completion graphics and callculations

Workover-Office-completion-graphics

Workover-Office-completion-graphics-and-calculations is a complete integrated system for the workover consultant or the workover office.

Workover Office graphics and calculations now cover both API and Metric units of measure

  • Vertical Well completion schematic
  • Rod Pump Well completion schematic
  • Directional Well completion schematic
  • Balanced Cement Plugs
  • Flange Reference
  • Frac Manifold schematic
  • Packer un-setting forces and calculations
  • Tubing Movement Calculations
  • Xtree Schematic
  • GLM Spacing

Any of the 1000+ hi-resolution completion tools can be rotated to any angle for a professional hi-impact well sketch

Workover-Office-completion-graphics-and-calculations includes an easy start with 17 of the most common well completions, plus Cement Plugs, Xtree schematic, Liners, Tie Backs, Packer Calculations, Field Testing Production Rates, Tubing Movement Calculations, Rod Pump Completions, Operator Report, 20 item GLM spacing, operators report and field reports plus Final Well Completion Report.

Workover-Office-completion-graphics-and-calculations includes an extended library of over 1000 hi-resolution workover and completion graphics completely automated on button clicks instead of drag and drop to give you a first class professional finish to your Wellbore schematics. Your final well report can be exported to your well file with a simple click as a single linked Excel worksheet, or emailed directly to the client

Workover-Office-completion-graphics-and-calculations, now includes the layout for a Frac Manifold iron library added to the program, complete with straights, 90° bends, tees, valves, pressure shut down valves, the complete package for a professional graphic output

Links to view some of the 100+ tools and equipment available in Workover Office
Windows Media
iPhone video

Gas Lift Mandrel Spacing
  •  x 

GLM Spacing

Gas Lift Mandrel Spacing

Easy to use Gas Lift Mandrel Spacing program (The latest version now includes API and Metric units)
Simply update the tubing tally,

Enter the required depths of each mandrel.
The program works out which joint or stand of tubing to install the Gas Lift Mandrels
Also with the option of tubing racked back in the derrick or new tubing picked up from the pipe racks.
The program handles the placement of  up to 20 GLMs

Packer Calculations 32 Bit
  •  x 

Packer Calculations

Oilwell Packer calculations

The Packer Calculation program will help you avoid having a packer unset during testing or squeezing operations.
The program also includes tubing movement calculations and a field estimate production rate calculator along with BHT chart
The program covers both compression and tension packers also maximum allowable swabbing depth for up strain packers. Since the forces are related to several differing factors you have the option of selecting the type of flow, whether there is no flow, mud/brine in the tubing, gas or oil flow. Then select the type of packer up strain (tension) or set down (compression). This data is used in the forces applied to a pkr calculations.

The program will warn you if forces applied to the packer from above or below will force the packer to unset. 

Electric Submersible Pump Completions
  •  x 
  •  x 
  •  x 
  •  x 
  •  x 
  •  x 

Workover Rig Maintenance

Workover Rig Maintenance Download the Training Video

Example Check lists details (PDF FILE)

Workover Rig Maintenance  (mp4)

A complete Workover Rig Maintenance program for Excel

Considering the number of Workover Rigs off contract and stacked it is now highly important that contractors have their equipment in ready to go on contract condition. Major oil companies and operating companies will require a history of good Rig Maintenance.

This Workover Rig Maintenance program consist of a complete maintenance schedule for all the equipment listed below. Any item listed on any of the check list worksheets can be changed and edited to suite any Workover Rig and any piece of equipment. It also covers Diesel Haulers and Water Haulers if you own your own trucks. Any item can be removed or changed to suite your Workover Rig and equipment.

The program consists of 55 check lists, we can customize the program with your company logo before shipping

  • Carrier
  • Mast
  • Main Control Console
  • Air Compressor
  • Diesel Tank
  • Water Tank
  • Mud Tank
  • Mud Pump
  • Crane
  • Forklift
  • Drill Pipe
  • Fire Fighting Equipment
  • Personnel Protection Equipment
  • Job Risk Analysis

The program keeps a complete record of all maintenance carried out

An introduction to the new Workover Rig maintenance program.

Workover Rig Maintenance  (Windows Steaming)

Rod Pump Completions
  •  x 

Rod Pump Completions

Rod Pump completions
This is the separate Rod Pump Completion program for rig supervisors that don’t need the full features in the Workover Office Professional version

You still have all the volumetric well bore calculations for isolating casing leaks along with cement plug, pipe in pipe out, calculations for plug backs and squeezes

Tubing movement
  •  x 

Tubing Movement

Tubing Movement Calculations

The Tubing Movement program is included in the Workover Office Pro version.
This separate version is just for quick reference for those that don’t need all the multiple functions of Workover Office Pro
This includes all tubing movement calculations. This program is included in the Packer Calculations software.
Force
Stretch/Contraction
Length Changes due to
Piston
Buckling
Ballooning
Temperature effect
Plus a basic estimated BHT chart

tank volumes and flow rates
  •  x 

Tank Volumes including Flow Rates

Tank Volumes including Flow Rates

Tank Volumes including Flow Rates for Round Tanks, Square Tanks, Vertical Tanks, Round Horizontal Tanks and tank straps

This tank volume and flow rate program gives you volumes and flow rates in various units of measure, partial volumes, tank strap charts for Round Vertical tanks, Square tanks and Horizontal Round tanks. Plus, Flow Rates into any size tank or vessel from a coffee cup, dope bucket to a million Bbl tank

Printable Tank Strap Charts can be selected to give you both API and Metric options Chart selection

  • Bbls/Inch,
  • Bbls/Foot,
  • M³/Mtr,
  • M³/Cm,
  • Liters/cm

Download a free trial

xtree schematic
  •  x 

Well Head Xtree Schematic

Well Head Xtree Schematic

The Well Head Xtree Schematic is a complete system for building a land based Well Head with a library of hi-resolution Drilling Spools, Flanges, Valves and Chokes, simply click on a component and drag it into place on your Well Head Sketch. The latest version includes a dual completion tubing spool

Options to Print or Export the Graphic to your well file for future reference and professional looking completion well bore report.

Download a free trial

Checkout the video

Tubular Database 32 Bit
  •  x 

Tubular Database

The Tubular Database give you reference to over 4100 different joints of pipe, Tubular database includes oil well casing and tubing specifications from 48″to 1.05″

Once the casing or tubing is selected you have full data regarding weight on hook annular volumes and capacities in either Bbls or Cu/ft for cementing calculations. Tubular Database also includes a casing Pressure Test function which allows you to run a casing pressure test after cementing is completed with a visual indicating and pressure drop. chart

Once the casing or tubing is selected you have full data regarding Weight on Hook, Burst, Collapse, Drift Size, Weak Member. Annular volumes and capacities in either Bbls or Cu/ft and a casing pressure test chart

4127 different tubular specifications in the database.

Download a free trial

Balanced Cement Plugs 64 Bit
  •  x 

Balanced Cement Plugs

Balanced Cement Plugs, Oilwell balanced cement plugs P & A plugs

  • Displacements
  • Buffer fluid ahead of cement slurry
  • Planned volume of cement slurry
  • Buffer fluid behind the cement slurry
  • Actual slurry volume pumped
  • Cement tops
  • Pipe in cement height
  • Pipe out cement height
  • Planned slurry volumes vs Actual slurry volumes

This can be used as an add in for DrillPro

Includes Water or Flushing chemicals ahead and behind plug calculations, pipe in cement top pipe out cement top, and since no cement job is 100% accurate the program produces both calculated and actual cement tops based on the slurry volumes pumped, Output graphic is printable and can be selected in either API and Metric units.

Download a free trial

Oilwell flanges
  •  x 

Oil Well Flange Reference

Oil well Flange Reference

Still got one of those worn out, hard to read cardboard slide rules….

The Electronic Flange Slide Rule replaces the old Cameron cardboard slide rule.

Oil well flange reference lookup speeds up a simple button click you have more than double the information on;

  • Flanges
  • Spools
  • Hubs
  • Ring Gaskets.

The program covers both API sizes and Metric sizes

Use the spinner buttons to find out;

  • Which ring gasket fits which flange
  • All the rig gasket sizes
  • API and RX
  • What wrench size is needed
  • Bold circle diameter
  • Number of bolt holes
  • Bolt Make up torque
  • Which hub needs which ring gasket
  • Which clamp fits which hub

All the information on Flanges, Spools, Hubs and Ring Gaskets you will ever need.

From 30″ 2000 psi to 1-13/16″ 10,000 psi or equivalent metric sizes

Download a free trial

Electric Submersible Pump Completions
  •  x 

Electric Submersible Pump Completions

Electric Submersible Pump Completions.

Electric Submersible Pump Completions, (ESP)
For both the man in the field and workover office coordinator keeping track of well files. The ESP completion report is a detailed report, complete with the production string, pump data and components. Once the basic well data header and well data is entered the report can be emailed to the client or head office. everything is is updated with a simple button click including a professional looking completion graphic.

The program includes a complete library of completion graphics for ESP completions. Tubing, casing, nipples, gas buster, protector, pump  using hi-resolution graphics for visual impact.

The output includes the detailed string and pump report plus the well bore schematic.

Print, Export, Email the pump data and tally sheets