Tubing Tally

Tubing Tally

Tubing Tally, is not just another simple Tbg Tally spreadsheet this Tubing Tally is complete with BHA add in, KB Correction, the program will allow you to not only produce the standard type of oil field tally sheets which are automatically completed for you as you enter your pipe tally. But also includes a well bore completion schematic to produce professional well completion sketches, The library of completion tools consists of down hole tool icons for vertical wells and horizontal wells.

Tubing Tally also includes a Hi-Resolution final well report for both vertical and horizontal completions with a vertical and horizontal tool library. The program comes complete with a well bore diagram template for both vertical wells and horizontal wells. the library of hi-resolution graphics which will allow you to produce professional hi impact well bore schematics

Tubing Tally 32 Bit. Optional selection

  • Tbg Size, ID, ppf,
  • Drift sizes are auto updated
  •  Connection type,
  • Grade,
  • Mud Weight
  • Weight in Air
  • Buoyed Weight
  • Drift size is auto filled in for you from the database.
  • Displacement
  • Volume
  • Depth plus BHA
  • Reverse Tally
  • Vertical Well Bore Graphic and Components
  • Horizontal Well Bore Graphic and Components
  • You can build a professional Well Bore Schematic with the available tools

You have the option of including the KB correction for accurate packer placement and leak isolation. As you enter the tubing lengths the capacities weight in air, buoyed weight plus corrected depths if a BHA is included are all automatically updated for you.

All the data you enter is linked to standard oil field tally sheets which can be printed or emailed

If you have laid down the tubing string the program includes a reverse tally section as there can be a considerable difference between picking up or running in and out of the derrick

The program includes a reverse tally if you laid down tubing there is a considerable difference in running tubing from the derrick or picking up tubing from the ppe racks

Pipe tally includes both casing tally and tubing tally, but separate versions are available

Well PLan 4

Well Plan

Well Plan

Well Plan is the single planned plot ideal to use with Casing design, the program  is based on the  minimum curvature method to design a precise and smooth well bore trajectory through multiple targets is quickly and easily accomplished using this program.

Planning well bore trajectory utilities and comparing Planned vs Drilled trajectories The Minimum Curvature method is used to calculate 3-dimensional displacements of the well bore according to “end-point” inputs supplied by the user. Minimum Curvature is widely accepted by the oil industry to be the most accurate mathematical analysis for directional surveys as opposed to previous, less rigorous methods such as Least Squares, Tangential, Average Angle and Radius of Curvature. View the latest version of well Plan

The program allows you to design multiple directional trajectories,side tracks and well intervention  for any well profile or import a trajectory;

  • Vertical,
  • Slant
  • Horizontal
  • S-Curve
  • Custom

The following data is calculated with a minimum of end point entries.

  • Target Data is included for up to four targets.
  • KOP & Build Rate (°/100Ft, °/30Mtrs)
  • EOB depth
  • Tangent depth or Lateral Section length
  • Drop Section and Turn Rates  (°/100Ft, °/30Mtrs)
  • EOD depth
  • Closure distance and azimuth

Charts presentations;

  • Vertical section view with lateral displacement vs true vertical depth (TVD)
  • Plan view (N/-S, E/-W) displacement vs true vertical depth (TVD)
  • Dog Leg Severity (DLS) vs measured depth (°/100Ft, °/30Mtrs)
  • WellPlan3 now includes Planned, Custom trajectories and up to 4 side tracks

The Planned and Drilled trajectory auto calculates the Planned vs Drilled trajectory with visual targets.

Actual directional surveys can be input as the well is drilled.

Each trajectory is compared with the actual drilled trajectory.

You have the option of importing a planned and actual surveys (MD, Inclination, Azimuth),

Planned, Drilled or Custom trajectories can be exported for use in other programs.

This program will be integrated with the latest version of Casing Design.

The software has a training video embedded in the software.

Download a Free Trial

Download a free trial of Well Plan 3

Training Video (showing the multi side track version)

HDD Trenchless Technology Solutions

HDD Plan for Trenchless Technology Solutions is a new innovated HDD program for multiple projects.

  • Trenchless Technology
  • River Crossings,
  • Hydro Power water courses,
  • Metro Tunnelling ,
  • Tunnelling under Airport Runways
  • Mining
  • City utility tunnelling
  • Water Course Galleries
  • Civil Engineering,

with a few inputs the software develops all the charting for Azimuth, Tangents, Turns and Bends and Dog Legs.

  • Tool Face Calculations
  • Effective Tool Face
  • Project to bit
  • Project ahead

The program provides for up to five (5), Targets based upon true vertical depths (TVD’s), and (+E –W), (+N –S), distances from the RKB (rotary kelly bushing), surface location which is the datum (zero point), for all other measurements.  Typically, Targets are determined by project constraints and then the Planned Borehole is designed to pass thru or near the Targets.  The program also provides for input of Actual Surveys so actual drilling progress can quickly and easily be compared to the Planned Surveys and the Targets.  Target closure distances and azimuths are compared to the closest point on both Planned and Actual Boreholes.

HDD Planning

The Minimum Curvature Method is used to calculate 3 dimensional Boreholes based upon X,Y,Z  displacements for each section.  The XYZ coordinates for this program equate to East-West (X), North-South (Y) and True Vertical Depth (Z).  The user can input the length of each section either by measured depth (MD) length or true vertical depth (TVD) length.  With Inclination and Azimuth inputs, the end point of each section is defined and the resulting Borehole is calculated with surveys generated at the User selected survey intervals up to 1000 surveys, on the Planned Survey sheet.

Geological Targets

HDD Trenchless Technology Solutions calculations, provides for up to five (5), Targets based upon true vertical depths (TVD’s), and (+E –W), (+N –S), distances from the RKB (rotary kelly bushing), surface location which is the datum (zero point), for all other measurements.  Typically, Targets are determined by project constraints and then the Planned trajectory is designed to pass thru or near the Targets.  The program also provides for input of Actual Surveys so actual drilling progress can quickly and easily be compared to the Planned Surveys and the Targets.  Target closure distances and azimuths are compared to the closest point on both Planned and Actual trajectories.

Charts

Charts of the Vertical Section view, Plan view and Dog Leg Severity (DLS) view are provided along with the trajectory parameters for each section such as section length, bend rate, turn rate, DLS, etc.  The Planned and Actual surveys and Charts can be printed as needed.

HDD ToolFace Plan for Hydraulic Directional Drilling projects. Is a user-friendly trajectory design interface for the unique requirements of the HDD (Hydraulic Directional Drilling), industry to plan drilling trajectories starting and ending at any inclination and with multiple Tangent and Curve (Bend) sections.  Applications for this program include civil engineering projects such as drilling under a river, road, airport runway, etc., to install utility shafts, drilling subway tunnels under cities, drilling hydro-electric water course tunnels, drilling mine shafts, etc.  The program provides for five (5) contigious Tangent and/or Bend, Turn sections which suffices for most applications.

daily drilling report
  •  x 

Daily Drilling Report

Daily Drilling Report. Fast and  efficient

  • Reporting system
  • Hydraulics
  • Bit record
  • Mud data
  • Formation data
  • Directional Survey
  • Mud parameters
  • Onshore Offshore Application
  • Full API style Daily Drilling Report Email directly to the Office
  • BOP Drills
  • People on Board

Daily Drilling Report, is very simple to use but very comprehensive, the Daily Drilling Report covers all daily drilling hydraulics and full reporting for mud data, formation data, bit record, supervision, for Onshore, Shallow Water Offshore and Deep Water reporting, for offshore rigs the report includes anchor tensions, weather report, people on board. Once the report is completed it can be emailed from within the program and also exported and saved to a local rig file.

BHA Design including BHA Reference and GraphicBHADesign
  •  x 

BHA Design including BHA Reference and Graphic

BHA Design including BHA Reference and graphic
Complete analysis for bottom hole assembly design (BHA Design).

The program allows up to 4 sections of Drill Pipe, four sections of HWDP, and four sections of drill Collars

For Horizontal Wells. The position of drill string can be changed to suite all well designs (all DCs or all HWDP)

The program consists of a graphic design and all the critical properties of your BHA
Hi-resolution graphics can be used to build a professional BHS Design graphic
First use the Input BHA Data  button and enter your complete Drilling String including the ancillary bottom hole assembly tools and equipment.
You can select all the critical scenarios in the BHA input section, As listed below.

Once you have entered all the BHA tools you are using these become available when you build your Graphic.

In the graphic design sheet click on a cell in the string column
and select the Drill Pipe Heavy Weight Drill Collars or the tools you have listed

Consists of 13 critical BHA Design reports.

Download a free trial copy of this program

BHAweb video

  • • Jar Triggering Load
    • BHA Properties
    • Wall Force
    • Torsional Dampening
    • Torque
    • Torsional Buckling
    • Available Weight
    • Critical BHA Speed
    • Critical DP Speed
    • Drill Pipe Fatigue
    • Max Over Pull

Including String Harmonics

Casing Tally

Casing Tally and Database

Casing Tally and Database is more than just a simple spread sheet

Casing Tally now includes a reverse casing tally for running pulled casing.

  • API or Metric
  • Choose up to 4 different casing sections
  • Auto calculates swapped joints
  • OD, ID  Grade, Capacity, Displacement, Drift size
  • displacement Mud Filled
  • Displacement floating
  • Onshore, Offshore application
  • allows the installation of up to 5 Diverter valves (DV collars)
  • Calculates shoe and float collar MD
  • Calculates stickup
  • Calculates which joints to install centralisers on
  • Hook Load in air
  • Hook Load buoyed weight

You can also add in your cementing equipment and select onshore or offshore casing installation. The program also includes selected depths for centralisers and printable API style tally sheets. The program allows you to select up to 4 different casing specs from a database of 4132 different joints. Or if required a tapered string.

You can export the tally to a rig file for future reference or email the completed tally to head office

Casing Tally can be incorporated with DrillPro

  •  x 

Mud Inventory

Mud Materials inventory Track all the mud materials on your location Complete database of mud materials

  • Daily Usage
  • Daily Mud Cost
  • Mud Received
  • Mud Transferred out
  • Edit the Chemical names, Starting inventory Sacks or Bulk materials
  • Fast and Easy to use
Free Point Calculator 64 Bit

Free Point Calculator

Free Point Calculator for Excel, is a Stuck Drill String calculator, and very easy, fast running program. OK not something you need every day but when you do instead of waiting for a third-party contractor to show up on the rig you have the answer in seconds just with a few inputs Select Drill Pipe, Heavy Weight and Drill collars add in the Over Pull, Pipe Stretch and get the point between surface and MD where your string in stuck,

Free Point Calculator will calculate the free point for any depth from MD to surface. User selectable units, API or Metric.

The usual problem is differential sticking due to a higher pressure in the bore hole compared to a lower formation pressure. This causes the drilling string (Drill Pipe, Drill Collars, BHA) to be forced against the wall cake. The wall cake or filter cake is deposited across low permeable zones causing the filter cake to build up, By reducing the hole pressure, by circulation chemicals or simply diesel oil to the stuck point,which reduces the hole hydrostatic pressure is often the easiest way to get unstuck.

Easily find where your drill string is stuck

Using up to

  • 4 sections of Drill Pipe
  • 3 sections of Heavy Weight
  • 3 sections of Drill Collars

You have the option to select API or Metric units

You can download a free trial of this handy program from this link

Packer Calculations 32 Bit
  •  x 

Packer Calculations

Oilwell Packer calculations

The Packer Calculation program will help you avoid having a packer unset during testing or squeezing operations.
The program also includes tubing movement calculations and a field estimate production rate calculator along with BHT chart
The program covers both compression and tension packers also maximum allowable swabbing depth for up strain packers. Since the forces are related to several differing factors you have the option of selecting the type of flow, whether there is no flow, mud/brine in the tubing, gas or oil flow. Then select the type of packer up strain (tension) or set down (compression). This data is used in the forces applied to a pkr calculations.

The program will warn you if forces applied to the packer from above or below will force the packer to unset. 

Drilling software
  •  x 

DrillPro Drilling hydraulics and reporting

DrillPro Drilling hydraulics and reporting

DrillPro, Drilling hydraulics and reporting Consists of a complete hydraulic and reporting program, Nozzle Selection. System Pressure Loss. Swab Surge Pressures Drill String. Surge and Maximum Casing Running Speed. Directional drilling and charting Well Control, kill sheet, Kill mud and kill graph. Capacities, Displacements. Annular Velocities. Flow characteristics (Turbulent-Laminar) Critical flow rates.  Bit Record Database Calculates for up to 4 Mud pumps 12 jets for PDC bits. Results for Casing or Casing & liners. Hydraulics report, Morning Report Printout Land and Offshore format Printout kill graph. Maximum Allowable Casing Speed for US API/Metric/Canadian Units.  Built in casing tally. Daily costs, Mud Chemicals inventory.  User can decide on multiple input output units.

DrillPro is a complete menu driven reporting program with back ground database for bit records, integrated into a  morning drilling report

Alsio available for DrillPro are add in Apps to complete the program

The latest version now allows manual inputs for MD and TVD on the Daily Drilling Report

The add in DrillPro apps cover the following applications

  • DP BHA Design
  • DP Flange Reference
  • DP Tubular Database
  • DP  Balanced Cement Plugs
  • DP Daily Drilling Costs
  • DP Free Point
  • DP Mud Inventory and daily cost

Download a free trial

tank volumes and flow rates
  •  x 

Tank Volumes including Flow Rates

Tank Volumes including Flow Rates

Tank Volumes including Flow Rates for Round Tanks, Square Tanks, Vertical Tanks, Round Horizontal Tanks and tank straps

This tank volume and flow rate program gives you volumes and flow rates in various units of measure, partial volumes, tank strap charts for Round Vertical tanks, Square tanks and Horizontal Round tanks. Plus, Flow Rates into any size tank or vessel from a coffee cup, dope bucket to a million Bbl tank

Printable Tank Strap Charts can be selected to give you both API and Metric options Chart selection

  • Bbls/Inch,
  • Bbls/Foot,
  • M³/Mtr,
  • M³/Cm,
  • Liters/cm

Download a free trial

Tubular Database 32 Bit
  •  x 

Tubular Database

The Tubular Database give you reference to over 4100 different joints of pipe, Tubular database includes oil well casing and tubing specifications from 48″to 1.05″

Once the casing or tubing is selected you have full data regarding weight on hook annular volumes and capacities in either Bbls or Cu/ft for cementing calculations. Tubular Database also includes a casing Pressure Test function which allows you to run a casing pressure test after cementing is completed with a visual indicating and pressure drop. chart

Once the casing or tubing is selected you have full data regarding Weight on Hook, Burst, Collapse, Drift Size, Weak Member. Annular volumes and capacities in either Bbls or Cu/ft and a casing pressure test chart

4127 different tubular specifications in the database.

Download a free trial

Well Control Kick Sheet Calculations
  •  x 

Well Control Kick Sheet Calculations

Well control calculations

This is the Dual Unit version for US API/Metric and Canadian units of measurement
For Land and Offshore. Vertical and Horizontal well control.
All the Industry standard Well Control methods.

  • Well Control Kick Sheet Calculations
    Drillers, Wait and weight, Stripping in, Concurrent method, Stripping In, Volumetric method
    Well Control Kick Sheet Calculations covers a lot more, plus all the stuff you learned at BOP school.

     

    • On Shore
    • Shallow Water Offshore
    • Deep Water Offshore
    • Directional Well Profile
    • Vertical Well Profile
    • Leakoff/PIT/FIT chart
    • Option to change kill Pump
    • 2 Different Slow Circulation Rates
    • Kill Line Friction Pressure Loss for Deep Water BOP stack
    • Choke Line Friction Pressure Loss for Deep Water BOP stack
    • Riser Disconnect for Deep Water
    • Kill Line Friction Pressure Loss for Surface BOP stack
    • Choke Line Friction Pressure Loss for Surface BOP stack
    • Drill String Configuration for Vertical Wells
    • Drill String Configuration for Horizontal Wells
    • Kill Methods for
    • Concurrent
    • Volumetric
    • Stripping
    • Drillers Method
    • Wait and Weight

      Well Control Kick Sheet Calculations also includes Accumulator volumes and closing times calculations
      Built in Leak off test, selectable as PIT or FIT, Max allowable influx height, Trip Tank Monitor, Kick Tolerance, Pore pressure, Pressure changes, well bore pressure changes to to changes in pump strokes or mud weight.
      API and Metric units. This version will be free with DrillPro

Download a free trial

Ton Miles Calculator for Drilling Rigs
  •  x 

Ton Miles Calculator

Ton Miles Calculator
Ton Miles Calculator, includes cutoff practice for rigs with no previous record.
Drilling Ton Miles. This is now available in a dual API and Metric unit version Drilling line cost analysis per ton mile. Total line cost. This program is in use with several international onshore and offshore operators, You can download a free trial of the Ton Miles Calculator from the free downloads section.
The new dual units ton Miles  program covers everything from;
Input
  • Feet – Metres
  • ppf – Kg/m
  • Lbs – 1000lbs – Kg – kNewtons – Tonne – daN
  • ppg – s.g. – Kg/M³
Output
  • Ton Miles
  • Ton Kilometres
  • daN Kilometres
Ton Miles Calculator Running Report
  • Drilling Line Cost per foot/metre analysis
  • Running Cost per Work Done (as in output above)
  • Accumulative Work Done (as in output above)
  • Accumulative cut off
  • Round Trip
  • Half Trip
  • Drilled
  • Cored
  • Running Casing
  • Wiper Trip
  • Horizontal Round Trip
  • Horizontal Half Trip
  • Horizontal Drilled
  • Running BOPs on Marine Riser

Download a free trial

View the training video

The Ton Miles calculator covers all drilling operations, round trip, half trip, coring ton miles. drilling ton miles. ton miles for running a liner ton miles for running casing to surface also includes ton miles due to extra drag in deviated wells, the cost per ton mile is calculated for reference

Rig Equipment Analysis

Rig Equipment Analysis

Rig Equipment Analysis.

Rig Equipment Analysis program keeps track of all Rig spares and usage. Equipment running conditions. Including tracking general pump spares used along with oils and filters, Serial and Asset Numbers, Running Hours, Lub Oils added, Coolant Levels Temperatures, Air and oil operating pressures Generator outputs, Volts, Amps, Kw. Noise, Vibrations, Over Heating, Leaks etc. Rig Equipment Analysis stores all the data in accessible background running data bases.

Rig Maintenance

Records the usage of;

  • Oil Filters
  • Fuel Filters
  • Coolants
  • Inhibitors
  • Lubrication Oils
  • Torque Oils
  • Mud Pump spares
  • All rope Soap and Dope items
  • All the equipment temperatures fuel pressures and more
  • Leaks,  vibrations, generation tracking and analysis

As you enter the data on a daily basis, the charts give you a visual indication of any equipment using an excessive amount of oils or spares also theft of spare parts

The results can be checked and verified against your rig inventory

coverage

  • 6 Rig Engines
  • 5 Rig Generators
  • 3 Mud Pumps
  • 2 Camp Generators

Rig Floor

  • Drawworks
  • Rotary Table
  • Rotary Chain
  • Swivel/Top Drive

Rig Vehicles

  • Tool pusher Vehicle Running Condition fuel, air and Oil filters
  • Crew Vehicle Running Condition fuel, air and Oil filters

Heavy Equipment

  • Crane
  • Front End Loader
  • Bulldozer
  • Forklift

Rope Soap and Dope items

Up to 25 items can be recorded or edited

Each entry is saved to printable background running databases

The databases can be exported to the rig files for future analysis,  can be printed or emailed directly to the office

Download a free trial

Balanced Cement Plugs 64 Bit
  •  x 

Balanced Cement Plugs

Balanced Cement Plugs, Oilwell balanced cement plugs P & A plugs

  • Displacements
  • Buffer fluid ahead of cement slurry
  • Planned volume of cement slurry
  • Buffer fluid behind the cement slurry
  • Actual slurry volume pumped
  • Cement tops
  • Pipe in cement height
  • Pipe out cement height
  • Planned slurry volumes vs Actual slurry volumes

This can be used as an add in for DrillPro

Includes Water or Flushing chemicals ahead and behind plug calculations, pipe in cement top pipe out cement top, and since no cement job is 100% accurate the program produces both calculated and actual cement tops based on the slurry volumes pumped, Output graphic is printable and can be selected in either API and Metric units.

Download a free trial

Oilwell flanges
  •  x 

Oil Well Flange Reference

Oil well Flange Reference

Still got one of those worn out, hard to read cardboard slide rules….

The Electronic Flange Slide Rule replaces the old Cameron cardboard slide rule.

Oil well flange reference lookup speeds up a simple button click you have more than double the information on;

  • Flanges
  • Spools
  • Hubs
  • Ring Gaskets.

The program covers both API sizes and Metric sizes

Use the spinner buttons to find out;

  • Which ring gasket fits which flange
  • All the rig gasket sizes
  • API and RX
  • What wrench size is needed
  • Bold circle diameter
  • Number of bolt holes
  • Bolt Make up torque
  • Which hub needs which ring gasket
  • Which clamp fits which hub

All the information on Flanges, Spools, Hubs and Ring Gaskets you will ever need.

From 30″ 2000 psi to 1-13/16″ 10,000 psi or equivalent metric sizes

Download a free trial