Home | About us | Downloads | Programs | Completions | Site Map | Contact Us
Drilling | Mud Engineering | Ton Miles | Workover | Casing | Well Control | Packers | Tubing Movement | GLM Spacing | Submersible Pumps
Tanks | Reporting

Search this site

 

Rig Store

Take me to the Rig Store

 

Credit Card Processing

 


Workover software

Workover Office Pro v4.0 is now available with New Features

View the comparission between the Standard and Professional versions

Central Printing. All printouts of the pre-set well completions can be selected from the main menu or the individual worksheets

  • Central Export. All well completions and the final well bore sketch can be selected and exported from the main menu
  • API or Metric units of measure can be selected from the individual worksheets
  • All the pipe sizes, casing, liners, tie back data and cement tops are automatically inserted into the final well bore sketch
  • Email Reports and completion sketches directly from the program
  • The graphics libraries consist of over 570 hi resolution graphics to give you a totally professional output
  • All the tools and completion equipment are pasted into your final well sketch with a simple button click

Registered users can upgrade to this new version for 40% off the

There are 2 versions of workover office

  • Workover Office Standard edition (lite version)
  • Workover Office Professional (full version)

Export final well sketches to your well files

Email the individual reports to your head office

There's no such thing as a perfect cement job so the following is calculated for you

  • THE NUMBER OF SACKS/SLURRY
    THAT SHOULD HAVE BEEN PUMPED
  • THE NUMBER OF SACKS/SLURRY
    THAT WERE ACTUALLY PUMPED

The height of the plug with pipe out based on the calculated amount of sacks/slurry volume with pipe out

The actual height of the cement plug based on the actual amount of sacks/slurry pumped with pipe out.

Every conceivable combination of annular and casing volume is figured out. Including all the calculated depths between top and btm perfs, bottom perf to TD, EOT to top perf, EOT to btm perf, to pkr and pkr to surface, or pkr to TOL
and so on. The volume of each section is given in an easy to read graphic format.


Webmaster and Graphic Design by Square One
Updated16/02/06 12:54:18