Home | About us | Downloads | Programs | Completions | Site Map | Contact Us
Drilling | Mud Engineering | Ton Miles | Workover | Casing | Well Control | Packers | Tubing Movement | GLM Spacing | Submersible Pumps
Tanks | Reporting

Search this site

 

Rig Store

Take me to the Rig Store

 

Credit Card Processing

 


Gas Lift Mandrel Spacing

The program includes the tubing tally

  • Works out which joints to run gas lift mandrels on
  • Auto fill joints left out. Joints left out show as zero on a reverse tally sheet
  • Auto fill displacements
  • Auto fill hook load in air and buoyed weight
  • Auto fill drift sizes
  • Allows you to select all the common pipe connections, weights, sizes and grades
  • Gives you a reverse tally function
  • Allows you to include a KB correction
  • Auto calculate KB corrected depths
  • Auto fill in standard oilfield tallysheets (you will no longer need to stock those yellow copies)
  • Allows you to printout the standard tallysheets with a simple keyboard click.
  • Handles tubing sizes from 2.375" to 4.5"

This is what it does. Once you are given the required glm depths all you need to do is enter the legnth of each mandrel and the required setting depth the program works out which joints to run the mandrels on.If you run a packer on bottom plus tail pipe, this is indicated along with the joints to lay down

You have 2 options either workout which joints to run the manrels on for the tubing tally as pulled out of the well or, for a new string of tubing picked up off the pipe racks

The GLM report is printable along with auto filled in standard oilfield tally sheets. This program is also included in Workover-Office-Standard edition and the Workover-Office-Pro edition

Download a demo

View the on-line Video


Webmaster and Graphic Design by Square One
Updated16/02/06 12:54:18