affil-5
Workover & Completions
Workover and Completions for Excel
!

Workover Office Professional edition

!
woa
Larger picture 
wopro

For XP and Office 2003

Workover Office Professional

Workover Office Professional edition is a complete integrated system for the workover consultant or the workover office.

The new version v4.0 now covers both API and Metric units of measure

Apart from the 17 most common well completions, plus Cement Plugs, Xtree schematic, Liners, Tie Backs, Packer Calculations, Field Testing Production Rates, Tubing Movement Calculations, Rod Pump Completions, Operator Report, 20 item GLM spacing, operators report and field reports plus Final Well Completion Report.

There is an extended library of over 500 hi-resolution workover and completion graphics completely automated on button clicks instead of drag and drop to give you a first class professional finish to your Wellbore schematics. Your final well report can be exported to your well file with a simple click as a single linked Excel worksheet

NEW Frac Manifold iron library add to the program

Workover Office v 5.0 For Vista/Office 2007

!
woopv50/XP/Vista/2007

For XP/Vista and Office 2007

Workover Office version 5 for XP/Vista/Office 2007

This program is for XP/Vista and Office 2007 it will not work with Office 2003

Workover Office version 5 now includes horizontal well completions and over 1000 hi-resolution completion tools and equipment

  • Vertical Well completion schematic
  • Rod Pump Well completion schematic
  • Horizontal Well completion schematic

Any of the 1000+ hi-resolution completion tools can be rotated to any angle for a professional hi-impact well sketch

Click on the Slide Show below the image for more program images

Submersible Pump Completions

!
suba
Larger picture 
subpump001
Submersible Pump Completions
The Submersible Pump Completion program is one of the easiest to use for both the man in the field and workover office coordinator keeping track of well files.
Once the basic well data header is updated it is a simple process to update the pump data then complete the final well report and schematic using hi-resolution graphics for visual impact. The ideal companion for completing submersible pump wells such as Reda, Kobe, Centrilift etc.

Horizontal Completions

!
horiza
Larger picture 
horiz001

Horizontal Completioons

This is the API/XP/Office 2003 version

Now included in The Vista/Office 2007 version of Workover Office Pro

Horizontal Completions has all the standard and common well configurations but with a libray of graphics specifically for horizontal wells. this is a powerful yet simple to use Excel program

Rod Pump Completions

!
rodsa
Larger picture 
rods001

Rod Pump Completions

This is the API/XP/Office 2003 version

Now included in the Workover Office Pro Vista/Office 2007 version

This is the separate Rod Pump Completion program for rig supervisors that don't need the full features in the Workover Office Professional version

You still have all the volumetric well bore calculations for isolating casing leaks along with cement plug, pipe in pipe out, calculations for plug backs and squeezes

Tubing Movement

!
tbgmovea
Larger picture 
tmov001

Tubing Movement calcs

This is the API/XP/Office 2003 version

Now included in the Workover Office Pro Vista/Office 2007 version

The Tubing Movement program is included in the Workover Office Pro version.
This includes all tubing movement calculations
Force
Stretch/Contraction
Length Changes due to
Piston
Buckling
Ballooning
Temperature effect
Plus a basic estimated BHT chart

Tubing Tally

!
tubinga
Larger picture 
TbgTally001

Tubing Tally

This is the API/XP/Office 2003 version

Now included in the Workover Office Pro Vista/Office 2007 version

The Tubing Tally program is included in the Workover Office Standard and Professional versions.
This version includes reverse tally option auto filled in standard tally sheets.
Tbg Size, ID, Ppf, Connection, and Grade the drift size is auto filled in for you from the database
You have the option of including the KB correction for accurate packer placement and leak isolation.
Standard Tally sheet printout

Packer Calculations

!
pkrsa
Larger picture 
PkrCalcs001

Packer Calculations

This is the API/XP/Office 2003 version

Now included in the Workover Office Pro Vista/Office 2007 version

The Packer Calculation program will help you avoid having a packer unset during testing or squeezing operations.
The program also includes tubing movement calculations and a field estimate production rate calculator along with BHT chart
The program covers both compression and tension packers also maximum allowable swabbing depth for upstrain packers. Since the forces are related to several differing factors you you have the option of selecting the type of flow, whether there is no flow, mud/brine in the tubing, gas or oil flow. Then select the type of packer upstrain (tension) or set down (compression). This data is used in the forces applied to a pkr calculations.
This program is included in the Workover Office Standard and Professional versions

Dual units Packer Calculations

!
pkr4
Larger picture 
PkrCalcsDual

API and Metric version v1.0

This is the API/XP/Office 2003 version

Now included in the Vista/Office 2007 version

This version covers both API and Metric units

The Dual units Packer Calculation program will help you avoid having a packer unset during testing or squeezing operations.
The program also includes tubing movement calculations and a field estimate production rate calculator along with BHT chart
The program covers both compression and tension packers also maximum allowable swabbing depth for upstrain packers. Since the forces are related to several differing factors you you have the option of selecting the type of flow, whether there is no flow, mud/brine in the tubing, gas or oil flow. Then select the type of packer upstrain (tension) or set down (compression). This data is used in the forces applied to a pkr calculations.

Extended Reach Wells

!
extended
Larger picture 
Ext001
Extended Reach Completions
Extended Reach Well completions
This new program is similar to the Horizontal completions program and includes all the graphics from horizontal completions plus more angled graphics for final wellbore schematics

Horizontal Round Tank Volume Calculator

!
hr-tanks2
Larger picture 
horiztanksv10

Tank Volumes

Horizontal Round Tanks only

The Horizontal Round Tank volume calculator will allow you to use any combination of units

Inputs can be in Meters or Feet. Outputs can be selected to give you

Meters/M³  -  Cm/Liters  -  Feet/Bbls  -  Inches/Bbls  -  Inches/US Gals

The program includes a Tank Strap Chart viewer and also the option to print out a full size chart in any of the above units 

 

Xtree Schematic

!
xtree2
XT001

Xtree Schematic

This is the API/XP/Office 2003 version

Now included in the Workover Office Pro Vista/Office 2007 version

A complete system for building a land based Well Head with a library of hi-resolution Drilling Spools, Flanges, Valves and Chokes, simply click on a component and drag it into place on your Well Head Sketch.

Options to Print or Export the Graphic to your well file for future reference