Copy of PM-folders
Rig Maintenance
Preventative Maintenace Scheduling and Rig Maintenance

Individual rig maintenance forms are called up by simply clicking on the appropriate form name.

The Rig Maintenance crew or tool pusher, rig mechanic etc, follows the itemized sections of the form and checks off the individual items as

  • OK
  • Needs Repair
  • Repairs Made.

On all the forms there is a section to add comments such as parts orders equipment transfers etc.

Once the form is completed it can be emailed (subject to an Internet connection on the rig), printed and fax to the head office for follow up

!

Rig Maintenance Office 2003

!
Arny6
PM&RM001
PM Scheduling and Rig Maintence XP/Office 2003

The Rig Maintence program consists of 2 modules 

PM Schedule for the Head Office to design the Preventative Maintenance Schedule

Rig Maintenance For the Rig Crew to follow up and complete the Schedule 

(additional Rig Copies on Request)

Rig Maintenance Office 2007

!
RM-PM Vista

Rig Maintenance and Preventative Maintenance Scheduling (As Above)

For XP/Vista/Office 2007

This will not work with XP/Office 2003

The Rig Maintence program consists of 2 modules 

PM Schedule for the Head Office to design the Preventative Maintenance Schedule

Rig Maintenance For the Rig Crew to follow up and complete the Schedule 

(additional Rig Copies on Request)

Rig Equipmet Analysis

!
RigEquiptAnalysis

Rig Equipment Analysis

For XP/Office 2003

Keep check of all your rig spares and which irtems are being use on which equipment

Complete inventory of all rope soap and dope items, pump parts, oil, lubricates, filters rotary chains, wire line find out visually from the charts which equipment is useing excessive amounts of parts, valves, valve seats, rods, rod packing, including pickups bull dozer, fork lift, front end loader, heavy transport etc

Rig Equipment Analysis

!
RigEquipt-Vista

Rig Equipment Analysis

For XP/Vista/Office 2007

This will not work with XP/Office 2003

Keep check of all your rig spares and which irtems are being use on which equipment

Complete inventory of all rope soap and dope items, pump parts, oil, lubricates, filters rotary chains, wire line find out visually from the charts which equipment is useing excessive amounts of parts, valves, valve seats, rods, rod packing, including pickups bull dozer, fork lift, front end loader, heavy transport etc