Balanced Cement Plugs

Balanced Cement Plugs, Oilwell balanced cement plugs P & A plugs

  • Displacements
  • Buffer fluid ahead of cement slurry
  • Planned volume of cement slurry
  • Buffer fluid behind the cement slurry
  • Actual slurry volume pumped
  • Cement tops
  • Pipe in cement height
  • Pipe out cement height
  • Planned slurry volumes vs Actual slurry volumes

This can be used as an add in for DrillPro

Includes Water or Flushing chemicals ahead and behind plug calculations, pipe in cement top pipe out cement top, and since no cement job is 100% accurate the program produces both calculated and actual cement tops based on the slurry volumes pumped, Output graphic is printable and can be selected in either API and Metric units.

Download a free trial

  •  x